MBK_PiledriverMagazine_engl_v2.qxp_Layout 1  23.05.19  10:07  Seite 6 
 reinforcement  
 solutions 
 cage welding machines 
 for the production of round  
 and square reinforcements  
 for driven and bored piles 
 VSM 
 LSM 
 ASM 
 RSM 
 HEADQUARTER 
 mbk Maschinenbau GmbH 
 Friedrich-List-Str. 19 
 D-88353 Kisslegg / GERMANY 
 Phone: +49 7563 9131 0 
 info@mbk-kisslegg.de 
 www.mbk-kisslegg.de 
 SALES 
 EUCONTEC 
 Mark A. Kraft 
 Fort Worth, Texas, USA 
 Phone: +1 214 400 7671 
 markakraft@icloud.com 
 works on both commercial and public works projects and installs  
 H-beams, pipe piles, sheet piles and pre-stressed concrete piles  
 the most. 
 Two major projects 
 Two large projects that the company has been involved in are the  
 California High Speed Rail and the District at South Bay. 
 The California High Speed Rail is a publicly funded high-speed  
 rail system under construction that is projected to connect the  
 Anaheim Regional Transportation Intermodal Center in Anaheim  
 and Union Station in Downtown Los Angeles with the Salesforce  
 Transit Center in San Francisco via the Central Valley. 
 It is eventually planned to provide a one-seat ride between  
 Union Station and San Francisco in two hours and 40 minutes – a  
 distance of 380 miles. Future extensions are planned to connect to  
 stations in San Diego County via the Inland Empire, as well as to  
 Sacramento. 
 “For the California High Speed Rail project, we installed 14-inch  
 square concrete piles for numerous bridges and load test programs,” 
  said Bird. “We have had the opportunity to be involved in  
 one of California’s largest infrastructures projects ever built. This is  
 the type of project that we will be proud one day to tell our grandkids  
 about. Although one would think that working on this project  
 in the rural farmlands of California would be a refreshing change  
 from the urban areas of Los Angeles, this project has its own set  
 of challenges. Typically, a biologist, paleontologist and American  
 Indian observer are all on site to ensure that pile driving work is  
 not ‘negatively’ impacting the natural environment.” 
 In addition, he says there are multiple quality control inspectors  
 along with geotechnical inspectors onsite. 
 “It is not uncommon for there to be twice as many inspectors  
 on  the  site  than  our  crew  actually working  at  the  site,”  he  said.  
 “Although we have an extensive ‘audience’ when we are working,  
 we welcome the challenge. This gives us the opportunity to shine as  
 a leader in our industry and show to all that we are able to perform  
 pile driving operations safely and efficiently.” 
 The District at South Bay is a 157-acre brownfield redevelopment  
 project that  is  being  constructed on a former  landfill site  
 commonly known as the Cal Compact Landfill in Los Angeles  
 County. Subject to the oversight of the California Department of  
 Toxic Substances Control, this mixed-use development is entitled  
 for and may include 1.83 million square feet of commercial, retail  
 CONTRACTOR MEMBER 
 www.piledrivers.org  PILEDRIVER  |  77 
 
				
/www.mbk-kisslegg.de
		/www.piledrivers.org
		link
		link