Most bulkheading complete. Marine hardware and utilities following bulkhead construction. Completed pier and flanking bulkheads looking northwest 
 APF Jet Filter 
 Weep Hole 
 Filtration System  
 Model JF-50000 
 NEW 
 Sheet Pile   
 Connector 
 Timber Uplift   
 Connector Galvanized 
   
 Model TC-7612  
 Provides tension  
 capacity of 12 tons  
 Box 1264 Clifton, NJ  07012-1264 
 NEW 
 Tel. 973-773-8400/800-526-9047 / Fax. 973-773-8442 
 Email: apf@associatedpile.com   Website: www.associatedpile.com 
 PROJECT SPOTLIGHT 
 We Furnish – 
 -New Prime Steel Piling Pipe 
 -New Surplus Steel Pipe 
 -Used Pipe – ERW Originally X42 – X70 
 Grade, OD Machine Cleaned to  
 BARE Metal, Beveled Ends 
 Let us help you with your piling needs and     
 save you money. 
 Call for prices delivered to your yard or  
 jobsite. 
 Call, Fax or Email Inquiries to: 
 Bill Thomas 
 Brad Ziehe 
 Phone: 979-830-1300     Fax: 979-830-1301 
 Email: brad@pipeunlimitedusa.com OR  
 mail@pipeunlimitedusa.com 
 When there was a clear harbor bottom to drive into, the sheet piling  
 drove very well; however, obstructions would at times cause  
 the crew to lose two to three days, advancing just five or ten feet. 
 Throughout the construction project, we had to maintain temporary  
 mooring locations and fendering systems for the ferries  
 and maintain access to the end of the pier at all times for the ferry  
 crew to secure the vessels in their berth. This was a substantial  
 task with a series of gangways necessary to get ferry personnel to  
 their mooring stations. During certain wind conditions, the ferries  
 could only use a berth on the lee side of the pier which occasionally  
 necessitated our crews to work on the opposite side of the pier.  
 The vessels also needed consistent access to fresh water, sewer  