PROJECT SPOTLIGHT
Piles along the outer edge
were installed with the
hammer within inches of the
existing structure. The precise
nature of this pile placement
required an attention to
detail unlike any other. There
was no room for error.
www.piledrivers.org PILEDRIVER | 65
/www.piledrivers.org