PROJECT SPOTLIGHT
• Pile Hammers - new / refurbished
• Custom Leads - all tubular, pinned style, boom point, fair
leads, fixed / swinging, onshore / offshore
• Accessories - drive caps, cushion material, air line oilers,
air hose, replacement parts
• Sales and rentals of pile driving equipment
• Repair and service of pile driving equipment
Bergerson Construction, Inc.
Marine & Heavy Civil Construction
55 Portway • Astoria, OR 97103
(503) 325-7130 • CCB# 63328
www.bergerson-const.com
Phone: 706-398-1178
Fax: 706-398-1188
www.vulcanhammer.com
When it comes to pile driving
projects where wetlands or
inaccessible areas exist, the
Erickson Air-Crane solves the
challenge of getting transmission
structures installed.
to the hammer. The flown weight of the
vibratory hammer with beam and caisson
clamps was approximately 16,875 lbs. The
Erickson Air-Crane involved in this project
was Erickson’s Sikorsky S-64. Its variants
have a load rating from approximately
25,000 lbs. The caissons being driven were
weighing in around 5,500 lbs.”
The Sikorsky S-64 has a unique aft-facing
pilot station that allows for the development
of a transmission line construction
system that is cost-competitive with conventional
methods.
According to Erickson, a leader in SKY
CRANE® heavy-lift operations that support
power transmission and infrastructure
projects, this system offers major benefits
to contractors, such as the following:
•• Erickson’s central assembly yards are
strategically located to minimize labor
travel time and other inefficiencies
that allow foremen to closely supervise
tower assembly
•• The company offers precise tower erection
scheduling and has the flexibility to
change course at a moment’s notice
•• The company is able to set towers in
place quickly
•• The company can deliver to remote and
mountainous terrain, which is inaccessible
to ground-based vehicles
Project challenges
Scholz said when it comes to pile driving
projects where wetlands or inaccessible
areas exist, the Erickson Air-Crane solves
the challenge of getting transmission structures
installed. However, that’s not to say
this project was without its challenges.
“The largest challenge for this project
was balancing a rapidly changing timetable
for electric transmission line outages on