ENGINEERING AFFILIATE
was as much the result of necessity as it
was ingenuity.
“The original intent was to provide
geotechnical engineering, but as we went
through different economic cycles and
recessions, we found there was not enough
work to sustain us as a geotechnical engineering
firm and we started expanding into
We Furnish –
-New Prime Steel Piling Pipe
-New Surplus Steel Pipe
-Used Pipe – ERW Originally X42 – X70
Grade, OD Machine Cleaned to
BARE Metal, Beveled Ends
Let us help you with your piling needs and
save you money.
Call for prices delivered to your yard or
jobsite.
Call, Fax or Email Inquiries to:
Bill Thomas
Brad Ziehe
Phone: 979-830-1300 Fax: 979-830-1301
Email: brad@pipeunlimitedusa.com OR
mail@pipeunlimitedusa.com
other areas,” he said.
Tectonic remains very much involved
in the pile driving sector. Besides providing
geotechnical investigations and engineering
recommendations for structural foundation
supports, it offers other support services.
That includes load testing programs
on pile installations as well as inspection,
verification and certification of pile foundations
to ensure compliance with applicable
building codes, including New York City’s
strict construction regulations and licensing
requirements.
What sets Tectonic apart from other
similar companies in the metropolitan New
York area is the fact that it has its own
inspections and materials testing division.
That means it can do its own onsite concrete
and soil testing and then analyze the
results of those tests in one of its own testing
laboratories within a matter of days.
“We’re a little bit unique compared to
some other engineering firms. Most engineering
firms, at least in the metro New
York area, don’t have their own testing
laboratory. The laboratories are generally
standalone businesses,” said Benvie. “It
does attract some clients to us. They look
at it as a value-added service, the fact that
we can do both the inspection and provide
the field personnel to do the inspection, not
just from an engineering standpoint, but we
also have the testing lab capability.”
The majority of the work Tectonic does
is performed in a tri-state area that includes
New York, New Jersey and Connecticut.
Some of the more recent projects the
company has been involved in include a
100,000-square-foot expansion of the Jacob
The Tappan Zee Bridge
PDCA Pile Driver - 2020 Issue 1
Hudson River Park Pier 26, New York City
RISE ABOVE THE ORDINARY
Complex waterfront structures projects
require extraordinary expertise, experience
and technical resources in geotechnical
engineering and foundation design.
MRCE’s Treasury of KnowledgeTM gives
you smart and inspired solutions to your
most intricate engineering challenges.
READ ABOUT THIS PROJECT
AND OTHERS ON MRCE.COM
Mueser Rutledge Consulting Engineers New York City | Washington, DC
74 | ISSUE 1 2020 www.piledrivers.org
/MRCE.COM
link
link