MARINE: GREATER THAN $5 MILLION
This project included phased repairs
and improvements to a 3,800 linear
foot reinforced concrete container
wharf – specifically the South Carolina
Ports Authority’s Wando Welch Terminal
in Charleston, S.C. Piling work included:
•• Driving of steel tipped concrete piles
(composite piles)
•• Replacement and strengthening of
Ship to Shore crane rails and supporting
substructure elements
•• Replacement of fender system for ships
•• Installation of barge fendering system
•• Installation of Ship to Shore container
crane pin sockets and tie downs
Cape Romain
Contractors, Inc.
By Sonny Dupre, Cape Romain Contractors, Inc.
The South Carolina Ports Authority –
Wando Terminal Improvements project
by Cape Romain Contractors, Inc.
Photos courtesy of Cape Romain Contractors, Inc.