In this environmentally sensitive locale,
building the new Sentinel Bridge presented
engineers with geological challenges as well.
These were addressed for the National Park
Service by the Federal Highway Administration
which oversaw design and construction.
Various diameter pipe, timber piles and
14-inch Monotube piles were test-driven to
determine their load-carrying capabilities.
The result: the wedging action of our uniformly
tapered Monotube proved to be the most
effective and economical foundation solution.
As this unique Yosemite Valley project
demonstrates, Monotube piles continue to
deliver high performance in a solidly economic
fashion nationwide. Take a clear look at these
advantages by sending for our free engineering
data materials today.
Free catalog.
SUMMARY* ULTIMATE
CAPACITY
(KIPS)
DRIVEN TEST PILE DEPTH
*Complete data available
0
20
40
60
80
100
120
14”
MONOTUBE
(220K)
123/4”
PIPE PILE
(245K)
103/4”
PIPE PILE
(137K)
16”
PIPE PILE
(401K)
Defying Yosemite’s
Glacial Till: Monotube
®
P.O. Box 7339 • Canton, OH 44705-0339
Ph. 330.454.6111 • Fax 330.454.1572 • Email: monotube@neo.rr.com
www.monotube.com
MONOTUBE PILE CORPORATION IS A SOLELY OWNED SUBSIDIARY OF THE DAVIDSON CORP.
/www.monotube.com
link